Logo

email   info@umutmakina.com.tr phone+90 312 354 14 38

The climbing cone is positioned by using positioners and then concrete is applied. After then, positioners and the formwork is replaced by climbing cone. By the stationary anchor left inside a realiable replacement is made. Then the climbing bracket is placed on.

Article No. Bar Q (mm) Q1/Q2 (mm) Length (mm) Hex (mm) Weight (kg/pc)
CF-D15 15 28/32 155 41 0,95
CF-D20 20 32/35 165 41 1,1
CF-D26 26 40/45 180 46 1,35